Factory Price 5500W 220V Independent Temp Control Side Seam Press Machine Multi Station Underwear Hot Press Shaping Equipment
Factory Price 5500W 220V Independent Temp Control Side Seam Press Machine Multi Station Underwear Hot Press Shaping Equipment — Seamless Bonding Equipment from Guangzhou Ronglan Technology Co., Ltd., built for seamless garment production. Reference price $2,911.00. MOQ 1.
- ModeloGuangzhou Ronglan Technology Co., Ltd.-051
- Pedido mínimo1
- PersonalizaciónTensión, enchufe, ancho de trabajo y configuración
- AsistenciaFormación, repuestos y asistencia técnica
Especificaciones
| Modelo | Guangzhou Ronglan Technology Co., Ltd.-051 |
|---|---|
| Cantidad mínima de pedido | 1 |
| Alimentación eléctrica | 110 V / 220 V / 380 V, configurado para su mercado |
| Configuración | Tensión, enchufe, ancho de trabajo y utillaje bajo pedido |
| Estado de la máquina | Nueva, con marcado CE cuando corresponda |
| Garantía | 12 meses para los componentes principales |
| Documentación | Manual de operación, esquema eléctrico y lista de repuestos |
¿Necesita la ficha técnica completa de este modelo con presión de aire, potencia nominal, peso neto y dimensiones? Solicitar la ficha técnica y se la enviaremos junto con el presupuesto.
Detalles del producto
Factory Price 5500W 220V Independent Temp Control Side Seam Press Machine Multi Station Underwear Hot Press Shaping Equipment is part of our Seamless Bonding Equipment range, engineered for seamless underwear, sportswear and compression garments — waistband splicing, edge welding and side-seam shaping. Each unit is built for repeatable factory output and is supported directly by the manufacturer.
Why this machine
- Purpose-built for seamless garment production.
- Stable, repeatable output for high-volume production lines.
- Available in multiple voltage and plug configurations for export markets.
- Operator training, spare parts and technical support from the factory.
Ordering information
- SKU: Guangzhou Ronglan Technology Co., Ltd.-051
- Reference price: $2,911.00
- Minimum order quantity: 1
- Lead time: 15–25 working days
Tell us the material you run and the output you need, and our engineers will recommend the right configuration for your line.
Solicitar presupuesto
Indíquenos qué fabrica, qué material utiliza y qué volumen de producción necesita. Enviaremos su consulta al ingeniero especializado en ese proceso.